Macmahon | Hope Downs 4 - Rail Earthworks & Bridge Construction. JV Between Rio Tinto & Hancock Prospecting | Calibration & testing of concrete batch plant to meet AS1379-2007 "Specifications & Supply of Concrete" requirements | Pilbara WA |
Komatsu | As Required | Tip Loading Test of Excavators of the maximum loading capacity of excavator when a modification is made to meet Australian Standards | Campbellfield VIC |
SkillsTech | Ongoing | Calibration services including pressure, gas & temperature | Acacia Ridge QLD |
Leighton Holdings | Chevron Gorgon LNG Project | Mobilising to site perdiodically on a monthly basis to provide on-site calibration services | Barrow Island WA |
QGC | Ongoing | On-site calibration and HV testing of various equipment across various sites | Wolobee Creek, Ruby Jo, Windibri QLD |